When a plot of land is forested, an aerial photo mainly shows the treetops. However, when designing a road, maintaining a power line, or calculating a volume, it is the ground that needs to be measured. Drone-based LiDAR solves this problem: a laser mounted on the drone measures millions of points, some of which reach the ground through gaps in the foliage. This guide explains how it works, when to choose it over photogrammetry, what results it can deliver, and what its limitations are.
How Drone-Based LiDAR Works
LiDAR (Light Detection and Ranging) measures distance by timing the return of laser pulses. Mounted on a drone, it scans the terrain while the positioning system (GNSS RTK and inertial navigation unit) records the sensor’s exact position and orientation at every moment.

A single pulse can produce multiple returns: the first from the top of a tree, others from the branches, and the last from the ground. This is what allows LiDAR to “see” beneath vegetation, whereas photogrammetry can only reconstruct the visible surface. During processing, the points are classified as ground, vegetation, buildings, or wires. Onboard cameras color the point cloud.
Drone-based LiDAR or photogrammetry: Which should you choose?
| Location | Drone-Based LiDAR | Drone Photogrammetry |
|---|---|---|
| Wooded area or scrubland | Recommended: Measure the soil beneath the vegetation | Limited: measures mainly the top |
| Open area (construction site, quarry) | Possible | Often sufficient and economical |
| Wires, poles, slender members | Clearly captured by the laser | Difficult to reconstruct |
| Visual texture, orthophoto | Yes, with dashcams | Yes, that’s his strength |


The right choice depends on how the data will be used. For a detailed comparison, read “Drone Photogrammetry vs. LiDAR: Which One Should You Choose?”
Uses
Wooded lots and large lots ready for development. The digital elevation model is based on ground-level data, not tree-top data. It serves as the foundation for designing a housing development, an access road, or a drainage system.
Road and rail corridors. A drone flight covers the road, embankments, ditches, and wooded areas along the roadside. It works well in conjunction with our mobile mapping: the vehicle captures the road surface and structures up close, while the drone covers what the vehicle cannot see.
Power lines. Photogrammetry has difficulty reconstructing cables, which are thin and lack texture. Lasers measure them directly. A survey makes it possible to determine the geometry of the conductors and their sag, the clearance above the ground or vegetation, and the location of towers and poles.

Mining sites and quarries. Calculation of the volumes of reserves, excavated material, and fill over large areas.
Riverbanks and floodplains. A digital elevation model of the riverbanks and floodplains, to be combined with a bathymetric survey for the submerged portion.
Deliverables
- Classified LAS or LAZ point cloud: ground, vegetation, buildings, wires
- Digital Elevation Model (DEM) and Contour Lines Ready for Civil 3D
- Vectorization of terrain features in CAD
- Volume Calculations
- Profiles and cross-sections along corridors
- Accuracy Report
How Does a Mandate Work?
- Needs Analysis. The intended use of the data determines the elevation, point density, and deliverables.
- Planning. Flight plan, terrain-adaptive scan mode, airspace clearances.
- Control network. Control and verification points measured on the ground, in the project’s coordinate system.
- Vol. Simultaneous LiDAR and image acquisition using an RTK base station.
- Treatment. Trajectory calculation, flight line assembly, classification, and generation of the DTM and curves.
- Quality control. Comparison with verification points and accuracy report.
- Delivery. Formats compatible with Civil 3D, GIS, or CAD.




Limitations
- Not down to the millimeter. For a building, structure, or as-built survey requiring millimeter-level precision, terrestrial 3D scanning remains the tool of choice.
- Not under a very dense forest. The denser the canopy, the fewer seeds reach the ground. Additional seeding on the ground may be necessary.
- Hidden features remain on the ground. The bottoms of culverts, pipes, and manholes are mapped through construction surveying, often during the same fieldwork assignment.
- The weather matters. Rain, fog, and strong winds can prevent the flight or compromise the data.
Our equipment: DJI Zenmuse L3 on a Matrice 400
Topo3D conducts its drone-based LiDAR surveys in-house using the DJI Zenmuse L3—the long-range LiDAR sensor launched by DJI Enterprise in November 2025—mounted on a DJI Matrice 400 RTK.
| Feature | Zenmuse L3 (according to DJI) |
|---|---|
| Laser | 1535 nm, Class 1 |
| Detection Range | up to 950 m (target with 10% reflectivity, 100 kHz) |
| Pulse-based feedback | up to 16 |
| Beam divergence | 0.25 mrad |
| Maximum flow rate | 2 million points per second |
| Scan Modes | linear, star-shaped, non-repeating |
| Cameras | 2 × 100 MP, 4/3 sensors, mechanical shutter, 107° horizontal field of view |
| Specified vertical accuracy | 3 cm at 120 m · 5 cm at 300 m · 10 cm at 500 m |
Values published by DJI, measured in a controlled environment. For each project, accuracy is measured at independent verification points and recorded in the report.
Compared to the previous generation (Zenmuse L2), the L3 has a laser spot that is about five times narrower and up to 16 returns per pulse instead of 5: more spots reach the ground beneath the vegetation. It also has a longer range, and its cameras cover a wider field of view, which reduces the number of flight lines.
Case Study: Frédéric-Back Park in Montreal
Frédéric-Back Park occupies the former Miron Quarry, a site measuring approximately 1 km by 2 km in the heart of Montreal. In 2012, a survey of the park was conducted using terrestrial laser scanning. In 2025, Topo3D repeated the survey using a drone, in collaboration with DroneXperts, to compare the two methods on the same site.
The 2025 survey. DJI Matrice 400 drone with a Zenmuse L2 sensor—the previous generation of the L3—and an on-site RTK base station. Flight at 120 m above ground level in terrain-following mode, at 5 m/s, using non-repeating scanning with 5 returns per pulse to better navigate under vegetation. Four ground control points were used to validate the results in the project’s coordinate system (NAD83 MTM Zone 8, CGVD28 elevations).

The results for the section covered by this first flight (approximately half of the site):
| Ground-Based Scanner (2012) | Drone-Based LiDAR (2025) | |
|---|---|---|
| Acquisition | about 10 days, up to 6 people, about 100 resorts | 52-minute flight |
| Treatment | about 20 days | about 2 hours |
| Available | Black-and-white AutoCAD drawing, areas without points | dense, colorful point cloud, orthophoto |
| Beneath the vegetation | a few points | good coverage |
The benefit isn’t just about speed: the drone views the site from above, without the blind spots inherent in a ground-based scanner. The full case study is published by DroneXperts.
Where do we operate?
Our Transport Canada-certified pilots are based in Boucherville and Val-d’Or, allowing us to cover both southern Quebec and the Abitibi region. For larger-scale projects, learn more about our aerial surveys.
In the field. In 2025, Topo3D surveyed the work site at Parc Frédéric-Back with a DJI Matrice 400 drone and the Zenmuse L3 sensor, for quantity calculations. The same year, it surveyed both branches of the Mascouche River with bathymetry and drone LiDAR, and in 2026, three road sections in Abitibi for the MTMD.
Frequently Asked Questions
Does LiDAR really penetrate trees?
The laser does not pass through the leaves; it passes through the gaps in the canopy. A narrow laser beam and multiple returns increase the number of points on the ground, but the denser the vegetation, the fewer there are.
How accurate can we expect it to be?
It depends on altitude, vegetation cover, the monitoring network, and data processing. The manufacturer of our sensor specifies a vertical accuracy of 3 cm at 120 m under controlled conditions. For each project, we measure it at independent verification points and include the results in the report.
How much area can be covered in a day?
It depends on the permitted altitude, the required point density, and the terrain. In Canada, flying above 122 m requires special authorization from Transport Canada. We plan each assignment based on the intended deliverables.
Is drone-based LiDAR replacing ground-based surveying?
No. It complements it. The hidden elements and details, buried beneath a very dense layer, still emerge to the surface.
What file formats do you accept?
LAS or LAZ for the cloud, and formats compatible with Civil 3D, GIS, or CAD for the terrain, curves, and vectorization. The coordinate system is that of your project.
Do you have a project in a wooded area, along a corridor, or on a large plot of land? Tell us about your project.




