In 2024, Topo3D scanned two structures of the A-10 / Champlain ramp in Brossard, measured the deformation of a steel girder and positioned the new girder for Construction Demathieu & Bard.
CONTEXT
The Samuel De Champlain Bridge, opened to traffic in 2019, links Montreal to the South Shore. On its approach in Brossard, a steel girder of a Highway 10 ramp spanning Highway 20 had been damaged by a truck passing under the structure. The Ministry had the girders of both affected structures repaired.
OUR MANDATE
Topo3D 3D-scanned both structures to document the existing geometry of the steel girders. From the scan, the team measured the deformation of the damaged girder (length, width and maximum amplitude) and delivered it as PDF profiles, one with vertical exaggeration, and as CAD and Civil 3D drawings. It then supported the contractor with measurements, laid out the cut line and positioned the new girder.