Photo: Ministère des Transports et de la Mobilité durable (Québec.ca, August 2026)
OUR PROJECTS · ROADS AND STRUCTURES
From October 2025 to May 2026, Topo3D surveyed Highway 15 North in Boisbriand, Blainville and Mirabel with night-time mobile LiDAR, airborne LiDAR and orthophoto, then laid out one section's markings for EBC.
CONTEXT
The MTMD is building a reserved lane for carpooling and public transit on northbound A-15 between Highways 640 and 50 (about 16 km), including widening the highway, rebuilding the pavement at two locations and widening an overpass. A first section of nearly 7 km has been open since December 2025, and work to the south, between Boisbriand and Blainville, began in October 2025 (Québec.ca).
OUR MANDATE
For the contractor: high-resolution orthophoto of the corridor, high-density night-time mobile LiDAR and complementary airborne LiDAR. Vector extraction of the roadway (markings, curbs, slopes, guardrails) and control network support. In 2026, layout of the pavement markings for one section based on the contractor’s files.
BY THE NUMBERS
DELIVERABLES