Period2009 to 2011

From 2009 to 2011, Topo3D provided 3D guidance for a drill rig boring at an angle through the deck of the Alexandra Bridge, between Ottawa and Gatineau, for Pomerleau, to reach the bridge footings.

CONTEXT

The Alexandra Bridge, a steel cantilever bridge opened in 1901 and designated a National Historic Civil Engineering Site, links Ottawa and Gatineau across the Ottawa River. In 2009-2010, the Government of Canada had its deck replaced and its steel structure, piers and abutments reinforced.

OUR MANDATE

Rope access technicians surveyed the girders under the deck. We then set up 3D guidance for a drill rig boring at an angle through the deck to reach the bridge footings.

DELIVERABLES

  • Survey of the girders under the deck
  • 3D guidance of the angled drilling
  • Layout and control surveys