In winter 2024-2025, Topo3D checked the flatness and plumbness of the gates of Beauharnois Lock 4 for Construction Interlag, on behalf of the St. Lawrence Seaway Management Corporation.
CONTEXT
The St. Lawrence Seaway has two locks on the Beauharnois Canal, including Lock 4 (upper). Major work on the gates is done during the winter closure of navigation.
OUR MANDATE
For Interlag, Topo3D surveyed the flatness of the leaves of gates 3 and 4, the plumbness and length of gate 4, and the heel post (quoin) and its bearing on gate 3. The team also surveyed the elevation of the gate anchorage tie rods and laid them out, with personnel accredited for lock access.
BY THE NUMBERS
DELIVERABLES