Portes de l'écluse no 4 de Beauharnois en chantier hivernal, sous le pont

Photo: Topo3D

OUR PROJECTS · MARINE

Beauharnois Lock 4: geometric control of the gates

ClientConstruction Interlag
OwnerSt. Lawrence Seaway Management Corporation
LocationBeauharnois Canal (QC)
PeriodWinter 2024-2025

In winter 2024-2025, Topo3D checked the flatness and plumbness of the gates of Beauharnois Lock 4 for Construction Interlag, on behalf of the St. Lawrence Seaway Management Corporation.

CONTEXT

The St. Lawrence Seaway has two locks on the Beauharnois Canal, including Lock 4 (upper). Major work on the gates is done during the winter closure of navigation.

OUR MANDATE

For Interlag, Topo3D surveyed the flatness of the leaves of gates 3 and 4, the plumbness and length of gate 4, and the heel post (quoin) and its bearing on gate 3. The team also surveyed the elevation of the gate anchorage tie rods and laid them out, with personnel accredited for lock access.

BY THE NUMBERS

  • 2 gates checked (gates 3 and 4)

DELIVERABLES

  • Flatness reports for gates 3 and 4
  • Plumbness and length report for gate 4
  • Quoin control sheet
  • Tie rod elevations