Mezzanine de la station Berri-UQAM, niveau des guichets (janvier 2026)

Photo: Jeangagnon (CC BY-SA 4.0, via Wikimedia Commons)

OUR PROJECTS · PUBLIC TRANSIT

Berri-UQAM: scanning and surveying for elevators and floors

ClientHulix Construction ltée
OwnerSociété de transport de Montréal (STM)
LocationMontreal (QC)
Period2018-2020

From 2018 to 2020, Topo3D scanned and surveyed the STM's Berri-UQAM station in Montreal for Hulix Construction during the addition of elevators and floor rebuilding, including to calculate the concrete used.

CONTEXT

Opened in 1966, Berri-UQAM is the busiest station in the Montreal metro and the transfer point between the Green, Orange and Yellow lines. Starting in 2018, the STM rebuilt part of the mezzanine and added two elevators serving the Green Line platforms, in service since November 2020, to make them accessible to people with reduced mobility.

OUR MANDATE

For Hulix Construction, the general contractor, Topo3D surveyed the station’s floor surfaces, at the fare-control level and the Orange and Green line levels, before, during and after the work to produce reports on the quantity of concrete used. The team also scanned the station structure, from the entrance building down to the Yellow Line, analyzed clashes with the planned elevators and laid out the steel structure, formwork and mechanical elements. Surveys were done at night, in windows of about four hours, at the contractor’s pace.

BY THE NUMBERS

  • 2 new elevators serving the Green Line platforms

DELIVERABLES

  • 3D scan of the station, from the entrance to the Yellow Line
  • Floor surveys before, during and after demolition
  • Concrete quantity calculations for the rebuild
  • Layout of the steel structure, formwork and mechanical elements