OUR PROJECTS · ROADS AND STRUCTURES

Bonaventure Expressway: layout and pour validation at axis 37

ClientConstruction Interlag
OwnerThe Jacques Cartier and Champlain Bridges Incorporated (JCCBI)
LocationBonaventure Expressway, Montreal
PeriodOctober and November 2025

In October and November 2025, Topo3D laid out and validated a slab pour at axis 37 of Montréal's Bonaventure Expressway for Construction Interlag, on behalf of JCCBI.

CONTEXT

Built between 1965 and 1967, the Bonaventure Expressway is reaching the end of its service life. JCCBI, which manages its federal sections, is carrying out work to extend the life of the elevated lanes between the Victoria Bridge and Peel Basin: repairing slabs on prestressed concrete girders, replacing expansion joints and correcting drainage. Construction Interlag performs on-demand work there for JCCBI.

OUR MANDATE

Layout according to site instructions, a surveyor on site during a slab pour, and survey validations, including checks of an existing ramp and of the supports for temporary shoring legs before their fabrication. Survey of an existing concrete block to analyze a conflict with a proposed footing, confirmation measurements of the caisson bracing, and 3D scanning of a ramp, delivered as CAD and Civil 3D plans.

DELIVERABLES

  • Layout data
  • Footing / concrete block conflict survey plan
  • CAD and Civil 3D plan of the scanned ramp