Photo: JBouchez, CC BY-SA 4.0, via Wikimedia Commons
OUR PROJECTS · INSTITUTIONAL
From 2011 to 2018, Topo3D laid out gridlines, scanned slab edges and produced plumbness and flatness reports on the new CHUM construction site in Montréal for Pomerleau and then several contractors.
CONTEXT
The new CHUM was delivered as a public-private partnership by Collectif Santé Montréal, responsible for design, construction, financing and maintenance: about 300,000 m² and 772 single rooms. The Research Centre was delivered in 2013, the hospital opened in September 2017 and the final phase of work was completed in 2021.
OUR MANDATE
From 2011 to 2018, Topo3D was the site surveyor for several contractors: Pomerleau-Verreault for the Research Centre, EBC for building B1, then Collectif Santé Montréal. The team checked and laid out gridlines, scanned slab edges, produced elevator shaft plumbness and floor flatness reports, measured slab thickness and surveyed piping. In 2018, it scanned the air handling units.
BY THE NUMBERS
DELIVERABLES