Le CHUM vu de l’avenue Viger, Montréal

Photo: JBouchez, CC BY-SA 4.0, via Wikimedia Commons

OUR PROJECTS · INSTITUTIONAL

CHUM: seven years of site surveying, from the research centre to the hospital

ClientPomerleau, then several contractors
OwnerCHUM (public-private partnership)
LocationDowntown Montreal
Period2011 to 2018

From 2011 to 2018, Topo3D laid out gridlines, scanned slab edges and produced plumbness and flatness reports on the new CHUM construction site in Montréal for Pomerleau and then several contractors.

CONTEXT

The new CHUM was delivered as a public-private partnership by Collectif Santé Montréal, responsible for design, construction, financing and maintenance: about 300,000 m² and 772 single rooms. The Research Centre was delivered in 2013, the hospital opened in September 2017 and the final phase of work was completed in 2021.

OUR MANDATE

From 2011 to 2018, Topo3D was the site surveyor for several contractors: Pomerleau-Verreault for the Research Centre, EBC for building B1, then Collectif Santé Montréal. The team checked and laid out gridlines, scanned slab edges, produced elevator shaft plumbness and floor flatness reports, measured slab thickness and surveyed piping. In 2018, it scanned the air handling units.

BY THE NUMBERS

  • Seven years on site (2011 to 2018)
  • Elevator shafts checked from level 6 to level 17

DELIVERABLES

  • As-built surveys and plans
  • Gridline layout and verification
  • Plumbness and flatness reports
  • Point clouds (slab edges, air handling units)