OUR PROJECTS · INSTITUTIONAL

Collège Charles-Lemoyne: surveying for the campus expansion

ClientFrare Gallant
OwnerCollège Charles-Lemoyne
LocationSainte-Catherine campus (QC)
Period2020-2022

From 2020 to 2022, Topo3D laid out the phase 1 excavation and then the inner courtyard features during the expansion of Collège Charles-Lemoyne's Sainte-Catherine campus.

CONTEXT

The Sainte-Catherine campus of Collège Charles-Lemoyne was expanded and redeveloped starting in fall 2020: new classrooms, an inner courtyard, an enlarged cafeteria and a triple gymnasium, delivered from 2021 to spring 2022.

OUR MANDATE

Topo3D provided construction surveying during the building’s expansion and renovation. After laying out the phase 1 excavation in 2020, the team laid out the benches and planting pits of the inner courtyard for Frare Gallant in 2022.

DELIVERABLES

  • Excavation layout (phase 1)
  • Layout of the inner courtyard features
  • Site layouts