Salle de serveurs du centre de données MTL-2 de eStruxture, à Montréal

Photo: eStruxture

OUR PROJECTS · BUILDINGS

eStruxture Data Centre in Montreal: construction surveying

ClientAnjinnov
OwnereStruxture
LocationMontreal (MTL-2)
Period2023-2024

From 2023 to 2024, Topo3D laid out the structure, conduits and mechanical work of a new block at eStruxture's MTL-2 data centre in Montreal for contractor Anjinnov.

CONTEXT

eStruxture operates a network of colocation data centres across Canada. Its MTL-2 site in Montreal occupies a historic building and offers more than 187,000 sq. ft. of colocation space, with a total capacity of 30 MW and more than 20 carriers on site. Anjinnov, a construction contractor, built a new block of the data centre there.

OUR MANDATE

For Anjinnov, construction surveying during work on the new block, from May 2023 to February 2024. Topo3D first scanned the existing room and set reference targets, then laid out the mud slabs, the structure and columns, the under-slab conduits, the interior systems and the mechanical work. At the end of the project, the team scanned the roof and produced as-built plans of the anchors, plates and acoustic screen.

BY THE NUMBERS

  • About 10 months on site (May 2023 to February 2024)

DELIVERABLES

  • Scan of the existing room
  • Layout of the structure, columns and conduits
  • Layout of interior and mechanical systems
  • As-built plans of the roof