Gouin Bridge: scanning and alignment of the bascule span axle

ClientCanmec
OwnerQuebec Ministry of Transportation
LocationSaint-Jean-sur-Richelieu
Period2019

In 2019, Topo3D scanned and checked the bascule span mechanism of the new Gouin Bridge in Saint-Jean-sur-Richelieu for Canmec, verifying the alignment of the pivot axle bearings.

CONTEXT

The new Gouin Bridge, a steel girder bridge about 465 m long, replaces the 1915 bridge between Saint-Jean-sur-Richelieu and Iberville. A fixed section crosses the Richelieu River and a bascule span crosses the Chambly Canal, a federal waterway. The bridge has two lanes in each direction, a two-way bike path and sidewalks; it opened to traffic in fall 2019.

OUR MANDATE

For Canmec, responsible for the structural steel, 3D scanning and survey checks of the bascule span mechanism during its construction and installation in 2019. Topo3D checked the alignment of the bearings on the axle around which the deck pivots, and measured on site the distance between the pivot centres and the length of the tie rods, which the fabricator had to adjust to that distance. Each survey was documented in a report.

DELIVERABLES

  • 3D point clouds during construction
  • Alignment check of the pivot axle bearings
  • Pivot and tie rod measurement reports