Travaux de la ligne souterraine Hertel-New York le long de l'autoroute

Photo: Hydro-Québec (underground line work)

OUR PROJECTS · ENERGY

Hertel–New York Interconnection: mobile LiDAR of the route

OwnerHydro-Québec
LocationFrom Hertel substation (La Prairie) to the border, Montérégie
Period2021 to 2024

From 2021 to 2024, Topo3D carried out a double-pass mobile LiDAR survey of the Hertel–New York interconnection corridor, from La Prairie to the border, for Hydro-Québec ahead of engineering.

CONTEXT

Hydro-Québec built a 400 kV underground direct-current line, about 57.7 km long, between Hertel substation in La Prairie and the Richelieu River at the border, where it connects to the Champlain Hudson Power Express to New York; a converter of about 1,250 MW was added at Hertel substation. Commissioning of the 1,250 MW link was announced in June 2026.

OUR MANDATE

With Géoposition, our land surveying partner: a double-pass mobile LiDAR survey along the roads of the route under study, with spherical photos and GNSS checks of the benchmarks, ahead of engineering. Delivery of tiled point clouds, a digital terrain model, 360° panoramas and a quality report; in 2024, on-demand construction surveying for the underground line.

BY THE NUMBERS

  • Corridor of about 60 km surveyed

Equipment: Leica Pegasus Two

DELIVERABLES

  • Tiled LAS point clouds
  • Digital terrain model
  • 360° panoramas and KML index
  • Control point quality report
  • On-demand construction surveying