From February to December 2024, Topo3D monitored girder elevations during each launch phase of the new Highway 19 bridge between Laval and Bois-des-Filion for Construction Interlag.
CONTEXT
The MTMD is extending Highway 19 by about 11.8 km between Laval and Bois-des-Filion as an urban highway with three lanes in each direction, including lanes reserved for public transit and carpooling. Lot 2, from spring 2023 to fall 2026, is the construction of the new Athanase-David bridge over the Rivière des Mille Îles, east of the existing bridge. Its girders are placed by launching, in several phases.
OUR MANDATE
For Construction Interlag, general contractor for lot 2, Topo3D surveyed the abutment anchors and the toe of the slopes, then monitored elevations under the girders and at the splices during each launch phase. Reports were delivered the same day so the team could decide on next steps without waiting. Time-distance progress charts were used to track production, and an end-of-phase survey closed out each stage.
BY THE NUMBERS
DELIVERABLES
“Impeccable service, competent and professional staff at Topo3D.”KEVIN VL., INTERLAG · translated from French