From 2020 to 2022, Topo3D surveyed 28 km of Highway 30 without lane closures, then provided Demix Construction with construction surveying for the pavement rehabilitation for Quebec's Ministère des Transports et de la Mobilité durable.
CONTEXT
From May to November 2021, the MTMD repaved the A-30 between the A-10 and the A-20 to improve the driving surface and widen the shoulders used by buses, with evening and night work and some ten weekend blitzes (Québec.ca). This work followed the repaving of adjacent sections in 2019 and 2020.
OUR MANDATE
For the rehabilitation contractor: an initial survey of 28 km of highway without lane closures (markings, pavement edges and centre, shoulders, catch basins, curbs). Construction surveying by sector over two seasons, often at night: layout of curbs and guardrails, alignments, a milling depth survey on a bridge. As-built checks of paving and concrete.