




Photo: VynedJ, CC BY 4.0, via Wikimedia Commons
OUR PROJECTS · ROADS AND STRUCTURES
In 2026, Topo3D carried out a night-time mobile LiDAR survey of the 16 km Highway 40 East work zone, from the Anjou Interchange to the Charles-De Gaulle Bridge, for EBC to quantify pavement repairs.
CONTEXT
The MTMD is repairing the concrete pavement of eastbound Highway 40, from the Anjou Interchange to the Charles-De Gaulle Bridge, from May 2026 to the end of summer 2028. The work includes slab repairs, installation of precast slabs and joint rehabilitation, to extend the life of the pavement and improve its skid resistance. It is done mostly at night and on weekends, with partial or full closures.
OUR MANDATE
High-density night-time mobile LiDAR survey under the contractor’s escort: two passes over the 16 km work zone, or about 32 km surveyed. The georeferenced point cloud documents the initial condition of the pavement and is used to extract rutting, potholes and cracks to quantify repairs. Topo3D also densifies the control network and carries out layout and follow-up surveys with GNSS and a robotic total station.
BY THE NUMBERS
DELIVERABLES
“I can only warmly recommend Topo3D for their unmatched professionalism and expertise.”P. PINSONNEAU, EBC · translated from French