In 2014-2015, Topo3D scanned the precast mould for the new deck slabs of the Honoré Mercier Bridge for JCCBI, to confirm its compliance with the 3D model before fabrication.
CONTEXT
The deck of the Honoré Mercier Bridge (1934), whose federal section is managed by JCCBI, was replaced section by section with precast concrete slabs during summer closures. In 2015, Rock to Road magazine described the role of laser scanning in this work.
OUR MANDATE
Scanning of the precast mould for the new deck slabs and comparison with the 3D model, to confirm that the mould was compliant before slab fabrication. Preliminary surveys of the supporting structures, deck scanning and construction surveying of slab placement on the bridge.