OUR PROJECTS · ROADS AND STRUCTURES
From 2016 to 2026, Topo3D monitored tensioning operations and surveyed and scanned the Île-aux-Tourtes Bridge (A-40) for Construction Interlag, CNPIAT and EXP, on behalf of the MTMD.
CONTEXT
The Île-aux-Tourtes Bridge on Highway 40 is reaching the end of its service life. The MTMD is replacing it with a new structure built north of the existing bridge, a design-build-finance project carried out by Groupe Nouveau Pont Île-aux-Tourtes (Dragados Canada, Roxboro Excavation and Construction Demathieu & Bard). A first structure is scheduled to open at the end of 2026.
OUR MANDATE
On the old bridge: 3D scans of the girders and real-time monitoring of tensioning operations (2016), then, during strengthening work, camber surveys before, during and after each tensioning with same-day reports, 3D surveys of the girders for the design of the reinforcements, slab surveys and georeferenced marking. For the new bridge: scanning of footings and annotated elevation drawings.