Carte d'Hydro-Québec des ouvrages du fleuve Saint-Laurent (avril 2024) : barrages de l'Île-Juillet-1 et 2 au bassin de S

OUR PROJECTS · ENERGY

Île-Juillet-1 Dam: surveying the gantry crane runways

ClientFournier Industries
OwnerHydro-Québec
LocationSalaberry-de-Valleyfield (QC)
Period2022

In 2022, Topo3D surveyed the gantry crane runway girders and pier crests of Hydro-Québec's Île-Juillet-1 Dam for Fournier Industries to check the alignment of the new rails.

CONTEXT

The Île-Juillet-1 Dam, a concrete gravity dam commissioned in 1941, is part of Hydro-Québec’s Beauharnois-Les Cèdres complex. In 2022, the girders and rails of its gantry crane runways were replaced.

OUR MANDATE

For Fournier Industries, Topo3D surveyed the top of the steel runway girders and the crest of the piers over a dozen or so site visits between spring and fall 2022. These surveys were used to check the alignment of the new rails against the criteria provided and to produce the survey report.

BY THE NUMBERS

  • About a dozen site visits (spring to fall 2022)

DELIVERABLES

  • Surveys of the runway girders and piers
  • Survey plans
  • Survey report