OUR PROJECTS · ROADS AND STRUCTURES

Jacques Cartier Bridge: scanning and surveying since 2012

ClientVarious: Montage Saint-Laurent, JCCBI, DJL, EXP, ConCreate, Construction Génix, Entreprises PERA, Construction Interlag
OwnerThe Jacques Cartier and Champlain Bridges Incorporated (JCCBI)
LocationJacques Cartier Bridge, Montreal / Longueuil
Period2012 to 2026

Since 2012, Topo3D has scanned and surveyed the Jacques Cartier Bridge, between Montréal and Longueuil, for JCCBI and its contractors, notably to fit new steel members to actual conditions.

CONTEXT

Opened in 1930, the Jacques Cartier Bridge is a steel cantilever bridge managed by JCCBI since 1978. Its deck was fully replaced in 2001-2002, and JCCBI is carrying out work to extend its service life to 2080, including the major rehabilitation of the Saint Helen’s Island section under way in 2025.

OUR MANDATE

Repeat mandates for JCCBI and its contractors, with procedures adapted to traffic and vibration: milling and paving thickness measurements, a span load test comparing point clouds unloaded, under load and after unloading, scanning of spans and towers with a drone survey to fit new steel members to actual conditions, extraction of rivet centres in IFC for fabrication, and survey work. In 2026, comparative tests of methods (laser, photogrammetry) for automated rivet detection.

BY THE NUMBERS

  • Spans 26 to 48 and towers scanned in 2016
  • Span load test with 3 trucks of 30 t

Equipment: Leica ScanStation P20 · Leica ScanStation C10 · RIEGL VZ-600i

DELIVERABLES

  • Point clouds and ortho-images of spans and towers
  • Rivet centres in IFC and model-to-cloud comparisons
  • Load test deformation report
  • Thickness reports and area calculations
  • Surveys and layouts