




Photo: Topo3D
OUR PROJECTS · INSTITUTIONAL
In 2023 and 2024, Topo3D laid out the gutters and drains and checked the ceramic tile surfaces of the pools at the Laval Aquatic Complex for Bousada.
CONTEXT
The Laval Aquatic Complex, a design-build project by Pomerleau, includes a 52 m by 25 m Olympic pool, a diving well and a leisure pool. It opened in December 2024.
OUR MANDATE
Topo3D provided Bousada with the surveying needed to position the gutters, drains and ceramic tile surfaces of the pools. The pool had to meet the standards of the international swimming federation, with very tight tolerances, which called for ongoing surface checks.
BY THE NUMBERS
DELIVERABLES