




OUR PROJECTS · AIRPORTS
In August 2019, Topo3D laid out the new runway at the La Grande-3 airport, owned by Hydro-Québec, then surveyed the as-built runway and the material stockpiles.
CONTEXT
La Grande-3 Airport, owned by Hydro-Québec, serves the facilities of the La Grande-3 generating station in Nord-du-Québec. It is not open to commercial flights, and its management is gradually being handed over to the Société de développement de la Baie-James.
OUR MANDATE
In August 2019, a Topo3D surveyor moved into the LG-3 camp for the layout of the new runway. He prepared the design layout plans, carried out the initial survey, then surveyed the runway as built and the material stockpiles.
DELIVERABLES