Vue aérienne de la passerelle cyclable en construction en bordure du fleuve, avec Montréal au loin

Photo: EBC inc.

OUR PROJECTS · MUNICIPAL

Longueuil–Boucherville bike path: preliminary bathymetry

ClientCities of Boucherville and Longueuil
OwnerCity of Boucherville
LocationSt. Lawrence River, Longueuil and Boucherville
Period2016

In 2016, Topo3D carried out a bathymetric survey and a shoreline survey along the river between Longueuil and Boucherville for both cities, for the preliminary study of the bike path over the water.

CONTEXT

Built between the river and Route 132, the Longueuil–Boucherville cycling and pedestrian link connects Promenade René-Lévesque in Longueuil with the Club d’aviron de Boucherville. Of its 2.2 km, about 1.7 km consists of steel walkways resting on 481 piles anchored in bedrock. Work began in September 2016, with the City of Boucherville as owner, in a joint undertaking with the City of Longueuil.

OUR MANDATE

Bathymetric survey with an echo sounder, positioned by differential GNSS, and topographic survey of the shore, along the river between Longueuil and Boucherville, in 2016. The depths and the bank profile were used for the preliminary study of the new bike path, built largely on walkways supported by piles set in the river.

DELIVERABLES

  • Bathymetric survey
  • Shoreline topographic survey