Vue aérienne du pont-tunnel et de l'île Charron en octobre 2024, pendant la réfection (à visionner avant usage)

Photo: Pymouss (CC BY-SA 4.0, via Wikimedia Commons)

OUR PROJECTS · ROADS AND STRUCTURES

Louis-H.-La Fontaine Tunnel: LiDAR and 3D scanning for the rehabilitation

ClientConsortium Tetra Tech-Parsons; Pomerleau; Renouveau La Fontaine C-C S.E.N.C.
OwnerQuebec Ministry of Transportation and Sustainable Mobility (MTMD)
LocationLouis-Hippolyte-La Fontaine Tunnel, A-20 and A-25, Montreal / Longueuil
Period2018 to 2024

From 2018 to 2024, Topo3D surveyed the Louis-H.-La Fontaine Tunnel and its approaches with mobile LiDAR and static scanning for the rehabilitation's design and construction teams, for the MTMD.

CONTEXT

Opened in 1967, the Louis-Hippolyte-La Fontaine bridge-tunnel is undergoing a major rehabilitation meant to extend its service life by about 40 years: structural repairs, equipment upgrades and replacement of the ventilation fans. The MTMD is delivering the project under a design-build-finance model with the Renouveau La Fontaine consortium.

OUR MANDATE

Supplementary surveys for the design team (A-20, Souligny interchange, Île Charron, A-25) during night work coordinated with the MTMD, followed by assignments for the builder: mobile LiDAR and static scans of the tunnel and its surroundings, cross-sections and a 3D model, construction surveying and clearance compliance reports.

EQUIPMENT

Equipment: Leica Pegasus Two

DELIVERABLES

  • Point clouds (mobile and static LiDAR)
  • Cross-sections and 3D model
  • DWG plans
  • Clearance compliance reports