In 2015-2016, Topo3D provided construction surveying to Demix Construction for the concrete rehabilitation of Runway 06-24 at Mirabel airport, for Aéroports de Montréal.

CONTEXT

From December 2015 to November 2016, Demix Construction rehabilitated Runway 06-24 at Mirabel Airport for Aéroports de Montréal. The runway is 3,658 m long and 61 m wide, and the work ran around the clock with two concrete plants on site. More than 50,000 m³ of demolished concrete and asphalt were crushed and reused for raising and grading, so no material left the site.

OUR MANDATE

Topo3D provided construction surveying for Demix during the rehabilitation of Runway 06-24 at Mirabel. On this day-and-night project, the surveying followed the demolition of the old pavement, the raising of the runway with material crushed on site and the construction of the new concrete pavement.

BY THE NUMBERS

  • Runway 3,658 m long and 61 m wide

DELIVERABLES

  • Construction surveying throughout the work
  • Pavement control surveys