Vue aérienne de l'usine PTA de Montréal-Est, avec le fleuve et les réservoirs voisins en arrière-plan

OUR PROJECTS · INDUSTRIAL

Montréal-Est PTA plant: 3D scanning and surveying

ClientCepsa Chimie Montréal, devenue Indorama Ventures PTA Montréal
LocationMontréal-Est
Period2012-2020

From 2012 to 2020, Topo3D scanned the Montréal-Est PTA plant in plant coordinates and provided construction surveying there for Cepsa Chimie Montréal, now Indorama Ventures PTA Montréal.

CONTEXT

The Montréal-Est plant is the only purified terephthalic acid (PTA) plant in Canada, with a capacity of about 600,000 t per year. Indorama Ventures bought it from Cepsa in 2015 (the transaction closed in June).

OUR MANDATE

Recurring 3D scanning program referenced to the plant coordinate system (water treatment, steam turbine, reactors, tanks, furnace, planned shutdowns). Inspection of parts at fabricators’ shops, plant benchmark plan and construction surveying (piles, anchors, grid lines).

BY THE NUMBERS

  • 128 scans for the water treatment area (2013)
  • 5 zones scanned during the October 2019 shutdown

Equipment: Leica P20 · Leica C10

DELIVERABLES

  • Point clouds in plant coordinates
  • Plant benchmark plan
  • Layout and anchor positioning reports
  • Tank verticality reports