Train de pavage en béton sur la piste 06L-24R et arpenteur au trépied, avec un avion en approche au-dessus du chantier,

Photo: Demix Construction (demixconstruction.ca, April 2019)

OUR PROJECTS · AIRPORTS

Montréal-Trudeau Airport: surveying for runways and aprons

ClientADM contractors: L.A. Hébert, Eurovia, Kingston Byers, Construction Chartel, J. Piccioni, Britton, Demix
OwnerAéroports de Montréal (ADM)
LocationMontréal-Trudeau and Mirabel airports
Period2012 to 2018

From 2012 to 2018, Topo3D provided construction surveying for runways, taxiways and aprons at Montréal-Trudeau and Mirabel airports for Aéroports de Montréal's contractors.

CONTEXT

In 2012, the main runway at Montréal-Trudeau was rebuilt between May and July using 3D machine control systems, a first in Canada according to the contractor (VINCI). Demix Construction then led the rehabilitation of runway 06L-24R, a three-phase project scheduled for completion in November 2020 (Demix).

OUR MANDATE

Recurring construction surveying for ADM’s contractors: apron expansion, rehabilitation of runways and taxiways with machine control, electrical duct banks, sidewalks and bollards. Layout, control of base course layers, final grades, pipe alignments and paving control, in coordination with the contractor’s surveyor.

BY THE NUMBERS

  • 3 phases of rehabilitation of runway 06L-24R
  • 7 km of electrical duct banks

DELIVERABLES

  • Layout
  • Layer control surveys
  • Paving and machine control
  • Sketches and final grades