OUR PROJECTS · AIRPORTS
In 2012, Topo3D provided construction surveying to Eurovia for the resurfacing of Runway 06L-24R at Montreal-Trudeau airport, an Aéroports de Montréal project using 3D machine control.
CONTEXT
In 2012, Construction DJL (Eurovia, VINCI group) rebuilt the surface layers of Montreal-Trudeau’s main runway, 06L-24R, between May 7 and July 17. The project placed 30,000 t of asphalt over 72,000 m² of graded surface, using 3D machine control, a first in Canada according to VINCI.
OUR MANDATE
Topo3D provided construction surveying for Eurovia during the resurfacing of Runway 06L-24R at Montreal-Trudeau in 2012. Over this ten-week project, carried out with 3D machine control, the surveying supported the demolition grading and then the placement of the new asphalt layers, through to fine grading.