Montreal-Trudeau Runway 06L-24R: construction surveying for the resurfacing

ClientEurovia
OwnerAéroports de Montréal (ADM)
LocationMontreal-Trudeau Airport, Dorval
Period2012

In 2012, Topo3D provided construction surveying to Eurovia for the resurfacing of Runway 06L-24R at Montreal-Trudeau airport, an Aéroports de Montréal project using 3D machine control.

CONTEXT

In 2012, Construction DJL (Eurovia, VINCI group) rebuilt the surface layers of Montreal-Trudeau’s main runway, 06L-24R, between May 7 and July 17. The project placed 30,000 t of asphalt over 72,000 m² of graded surface, using 3D machine control, a first in Canada according to VINCI.

OUR MANDATE

Topo3D provided construction surveying for Eurovia during the resurfacing of Runway 06L-24R at Montreal-Trudeau in 2012. Over this ten-week project, carried out with 3D machine control, the surveying supported the demolition grading and then the placement of the new asphalt layers, through to fine grading.

BY THE NUMBERS

  • Project of about ten weeks
  • 72,000 m² of runway graded

DELIVERABLES

  • Construction surveying throughout the work
  • Paving control surveys