Photo: Jeangagnon, CC BY-SA 4.0, Wikimedia Commons
OUR PROJECTS · INSTITUTIONAL
In 2024-2025, Topo3D provided construction surveying for the transformation of the Musée d'art contemporain de Montréal, at Place des Arts, for Construction Macogep, on behalf of the SQI.
CONTEXT
The Musée d’art contemporain de Montréal, at Place des Arts, is being transformed to plans by Saucier + Perrotte and GLCRM Architectes, on behalf of the Société québécoise des infrastructures. After the atrium windows were removed and the concrete facade was demolished in 2024, new steel structures were erected in 2025; reopening is planned for 2028.
OUR MANDATE
For Macogep, Topo3D has provided construction surveying for the museum’s transformation since 2024. The team validated and set up the site reference system, laid out gridlines on three floors and levelling benchmarks on ten floors, then laid out the new structures and openings. It also followed the demolition work and checked the slabs, as requested by the site team.
BY THE NUMBERS
DELIVERABLES