In 2024-2025, Topo3D provided construction surveying for the transformation of the Musée d'art contemporain de Montréal, at Place des Arts, for Construction Macogep, on behalf of the SQI.

CONTEXT

The Musée d’art contemporain de Montréal, at Place des Arts, is being transformed to plans by Saucier + Perrotte and GLCRM Architectes, on behalf of the Société québécoise des infrastructures. After the atrium windows were removed and the concrete facade was demolished in 2024, new steel structures were erected in 2025; reopening is planned for 2028.

OUR MANDATE

For Macogep, Topo3D has provided construction surveying for the museum’s transformation since 2024. The team validated and set up the site reference system, laid out gridlines on three floors and levelling benchmarks on ten floors, then laid out the new structures and openings. It also followed the demolition work and checked the slabs, as requested by the site team.

BY THE NUMBERS

  • Gridlines laid out on 3 floors
  • Levelling benchmarks on 10 floors

DELIVERABLES

  • Layout of gridlines and structures
  • Layout of openings
  • Slab checks