




Photo: Olivier Blouin for CIMA+
OUR PROJECTS · ROADS AND STRUCTURES
From 2017 to 2018, Topo3D 3D scanned the new Normandie footbridge over Highway 20 in Longueuil during its construction, for the City of Longueuil.
CONTEXT
The City of Longueuil rebuilt the Normandie footbridge over Highway 20 to give residents back access to the river shore; it was inaugurated on September 27, 2018. The new 200 m steel truss footbridge, with a 50 m centre span, includes a three-storey lookout.
OUR MANDATE
3D scanning during the construction of the new footbridge.
BY THE NUMBERS
DELIVERABLES