Old Champlain Bridge: super girder monitoring and span scanning

ClientJCCBI and contractors/engineers
OwnerThe Jacques Cartier and Champlain Bridges Incorporated (JCCBI)
LocationChamplain Bridge (1962-2019), Montreal
Period2013 to 2017

From 2013 to 2017, Topo3D surveyed the super girder in 3D and scanned numerous spans of the old Champlain Bridge in Montreal for JCCBI and its contractors, to analyze deformation.

CONTEXT

In November 2013, a crack was found in an edge girder of the old Champlain Bridge. In late November, JCCBI installed a 75-tonne prefabricated super girder to stabilize the cracked girder while keeping traffic moving, then replaced it with a permanent modular steel truss in 2014.

OUR MANDATE

Night-time 3D surveys of the super girder before and after it was tensioned, followed by comparable monthly surveys for JCCBI. Scanning of numerous spans for the bridge engineer, at night and from a barge or aerial lift, deformation and plumbness analyses, and construction surveying, layout and camber control for the contractors.

BY THE NUMBERS

  • 4 monthly surveys of the super girder (February to May 2014)
  • 3 girders surveyed after post-tensioning (2017)

Equipment: Leica ScanStation P20 · Leica ScanStation C10

DELIVERABLES

  • Deformation and plumbness reports
  • Monthly girder survey reports
  • Span point clouds
  • Layout and camber checks