Viaduc du REM en construction, août 2021 (à visionner avant usage)

Photo: Clump (CC0, via Wikimedia Commons)

OUR PROJECTS · PUBLIC TRANSIT

REM: from 3D existing-conditions documentation to construction surveying

ClientHatch; NouvLR consortium; REM contractors
OwnerCDPQ Infra
LocationGreater Montreal (Central Station, Mount Royal Tunnel, Deux-Montagnes line, South Shore)
Period2016 to 2022

From 2016 to 2022, Topo3D scanned existing conditions for the REM, including the Mount Royal Tunnel and the Deux-Montagnes line, then provided construction surveying, for CDPQ Infra, Hatch and NouvLR.

CONTEXT

CDPQ Infra’s Réseau express métropolitain (REM) is a 67 km automated light metro with 26 stations. The first segment, from Brossard to Central Station, entered service on July 31, 2023; the northern branch opened on November 17, 2025.

OUR MANDATE

During design, for CDPQ Infra’s engineer: 3D documentation of existing conditions (Central Station platforms, the 7 km Mount Royal Tunnel with a traverse tied to the geodetic network, the Deux-Montagnes line by multi-pass mobile mapping, 64 km of track in all, overpasses) for a tender with no site visits, often at night. For the builder: night-time mobile LiDAR to plan construction, twice-daily surveys of the rails and prisms in front of the caissons under rail protection, layout and pre-pour compliance reports.

BY THE NUMBERS

  • 64 km of track scanned
  • 7 km traverse in the Mount Royal Tunnel
  • About 126 km of mobile LiDAR in 15 segments (2018)

Equipment: Leica Pegasus 2

DELIVERABLES

  • ReCap point clouds by sector
  • Extraction of surfaces, clearance envelopes and clearances
  • Plan of clearances under structures
  • Control and accuracy reports
  • Rail monitoring reports
  • Layout and compliance reports