Véhicule de cartographie mobile Topo3D le long du corridor du REM de l'Est

Photo: Topo3D

OUR PROJECTS · PUBLIC TRANSIT

REM de l'Est: mobile LiDAR and corridor plans for the preliminary design

OwnerCDPQ Infra
LocationMontreal (downtown, East sector and North branch) (QC)
Period2020-2022

From 2020 to 2022, Topo3D surveyed and 3D-mapped the REM de l'Est corridor in Montreal with mobile LiDAR for CDPQ Infra's preliminary design, before the project was abandoned.

CONTEXT

Announced by CDPQ Infra in December 2020, the REM de l’Est called for 32 km and 23 stations. In May 2022, the downtown section was dropped and CDPQ Infra withdrew; the project became the Projet structurant de l’Est.

OUR MANDATE

Although the project was abandoned, Topo3D completed the corridor survey and plans for the preliminary design. The team designed an approach combining mobile LiDAR, terrestrial surveys and an all-terrain vehicle, established GNSS control, then produced the classification, 3D vectorization and a tiled DTM.

BY THE NUMBERS

  • 30 km of corridor surveyed
  • 34 tiles of 1 km by 1 km delivered

Equipment: Leica Pegasus 2

DELIVERABLES

  • Classified LiDAR point clouds
  • 3D vectorization of the corridor
  • Tiled digital terrain model
  • Technical report