Route 116 (Saint-Bruno): mobile LiDAR for road design

ClientGHD
OwnerQuebec Ministry of Transportation and Sustainable Mobility (MTMD)
LocationSaint-Bruno-de-Montarville
Period2022-2025

In 2022, Topo3D surveyed about 3 km of Route 116 in Saint-Bruno-de-Montarville with mobile LiDAR for GHD, to support the design of the pavement and two-culvert rehabilitation.

CONTEXT

Route 116 is a 267 km national highway that starts in Longueuil and crosses Montérégie as Sir-Wilfrid-Laurier Boulevard, including in Saint-Bruno-de-Montarville. On this section, between Seigneurial Ouest and De Boucherville boulevards, the MTMD is replacing two culverts and converting the lighting to LED in fall 2026, before paving.

OUR MANDATE

For GHD, in support of the design of the pavement and two-culvert rehabilitation, Topo3D surveyed about 3 km of Route 116 in late summer 2022 with a vehicle-mounted mobile LiDAR system, tied by GNSS to a base set up on a geodetic benchmark. The drawing from the vector extraction was delivered in DWG in September 2022. In 2025, the same point cloud was provided in ReCap format to check guardrail heights.

BY THE NUMBERS

  • About 3 km of road surveyed

DELIVERABLES

  • Mobile LiDAR point cloud (ReCap)
  • Vector extraction (DWG)
  • Data for guardrail verification