Saint-Pierre collector sewer: underground 3D scanning

OwnerQuebec Ministry of Transportation (Turcot project)
LocationMontreal (Saint-Jacques bridge area)
Period2013

In 2013, Topo3D 3D-scanned the Saint-Pierre collector sewer beneath Montreal for the Ministère des Transports du Québec, to locate its route before the footings of the new Saint-Jacques overpass.

CONTEXT

The Saint-Pierre high-level collector, a City of Montreal sewer built in 1930 about 30 m below ground, crossed the future Saint-Jacques bridge of the Turcot project. Deemed deteriorated and incompatible with the new structure, it was reinforced and then diverted southward over 850 m starting in 2014, using 12 m diameter shafts. Demolition of the old Saint-Jacques bridge was delayed while this work took place.

OUR MANDATE

Underground survey and 3D scanning of the Saint-Pierre collector, some thirty metres below the surface, to establish its exact position before placing the footings of the new Saint-Jacques overpass. Topo3D delivered the collector route with its alignment and elevations, an unrolled view and sections of the structure showing the planned caisson piles, along with a report with videos.

BY THE NUMBERS

  • Collector surveyed some 30 m below ground

DELIVERABLES

  • Point cloud of the collector
  • Route with alignment and elevations
  • Unrolled view and sections (DWG/PDF)
  • Report and videos