In 2012, Topo3D used a total station to survey the anchor bolts in the pilasters of the Saputo Stadium expansion in Montreal for Broccolini, before steel erection.
CONTEXT
Broccolini built Saputo Stadium in Montreal’s Olympic Park, then its 2011-2012 expansion, carried out for the Montreal Impact’s arrival in MLS. Capacity rose to about 20,000 seats, with corporate boxes and a partial roof. The first match in the expanded stadium was played on June 16, 2012.
OUR MANDATE
For Broccolini, total station survey of the anchor bolts cast into the concrete pilasters of the expansion, from January to March 2012, before steel erection. Topo3D crews visited the site by sector, keeping pace with the formwork, starting on the east side. After each visit, the contractor received a report of deviations between the anchors and the drawings, with a drawing.