Since summer 2025, Topo3D has provided construction surveying for the V-4 overpass at Montréal-Trudeau Airport for Grandmont Ponts et Viaducs, on behalf of Aéroports de Montréal.

CONTEXT

The V-4 overpass is part of Aéroports de Montréal’s Accès program, the component of the Plan de vol 2028-2035 covering the airport’s roads, drop-off areas and parking. It will provide direct access to the P4 parking lot from Highways 20 and 520 and will form the main ramp between the drop-off areas and the terminal. Most of the steel girders were in place by July 2026.

OUR MANDATE

For Grandmont Ponts et Viaducs, responsible for the structural work, Topo3D has provided construction surveying for the bridge since summer 2025: layout of the centrelines and piles of each support, as-built surveys of the piles and caissons, elevation checks of the abutments and bearing seats, and regular monitoring of the sheet piles at the nearby pumping station. Surveys are sent to the site team after each visit.

DELIVERABLES

  • Layout of centrelines and piles
  • As-built surveys of piles and caissons
  • Elevation checks of abutments and bearing seats
  • Monitoring of the pumping station sheet piles