Échangeur Turcot : six ans de numérisation, LiDAR et drone

3D Surveys, LiDAR and Surveying for Roads, Bridges and Structures

Topo3D measures the actual condition of your roads and structures, at night and under traffic, then supports the project all the way to the as-built. You decide on rehabilitation work based on verified data, not on original drawings.

In Quebec, road infrastructure spending goes to maintenance first. The 2026-2036 Quebec Infrastructure Plan sets aside $35.7 billion for the road network, and the asset maintenance deficit on that network has reached $24.5 billion. In the 2026-2027 assessment, barely more than half of the ministry’s structures are rated in good condition. For asset managers and contractors, the challenge is twofold: knowing the actual condition of a structure built decades ago, then working within closure windows of a few hours, often at night. For more than ten years, Topo3D has been scanning, surveying and laying out on bridges, interchanges and tunnels across Greater Montreal and elsewhere in Quebec, for the MTMD, JCCBI, municipalities and their contractors.

Existing conditions measured, not assumed

Your rehabilitation plans start from a georeferenced point cloud of the structure as it stands today.

Surveys that fit the window you're given

Mobile LiDAR and scanning planned around a night closure or an escort, with no additional lane restrictions.

Measurements that keep pace with the project

Layout, pour checks and load monitoring, with reports delivered the same day when the team needs them.

What is your challenge?

Pick the question that sounds like yours

What data should drive rehabilitation priorities for an aging inventory of structures?

The problem

The asset maintenance deficit of Quebec's road network keeps growing, and a significant share of structures are rated in very poor condition. Visual inspections tell you where to look, but they don't always provide measured geometry that can be compared from one year to the next.

Our solution

We produce a dated baseline of the structure: a georeferenced point cloud, orthoimages of its faces and, where needed, drone inspection photos. A second survey, done later on the same control network, lets you compare the two states and pinpoint what has moved.

What you gain
  • Priorities backed by measurements
  • History that can be compared from one campaign to the next
  • Fewer repeat visits to the structure
Deliverables
georeferenced point cloudorthoimages of the facescomparison report between two surveys
Related project: Papineau-Leblanc Bridge: 3D scanning inside the pylons

Do your original drawings still describe the structure you need to repair?

The problem

On a bridge or interchange built forty or sixty years ago, archived drawings show neither the successive repairs nor the deformations. A conflict between a planned footing and an existing mass, discovered during construction, costs days on site.

Our solution

Before design or before demolition, we scan the structure and its surroundings, then deliver the data in the design team's format: 3D models in MTQ format, CAD and Civil 3D drawings, profiles. At the Turcot Interchange, this initial campaign covered all the existing structures.

What you gain
  • Conflicts caught at the design stage
  • Quantities calculated on actual geometry
  • Tender documents based on documented existing conditions
Deliverables
existing-conditions point cloud3D model and breaklinesconflict survey plandeformation profiles
Related project: Turcot Interchange: six years of 3D scanning, LiDAR and drone surveys

How do you survey a highway or tunnel during a night closure lasting only a few hours?

The problem

Major road projects follow one another in the Montreal region, and full closures mostly happen at night or on weekends. A conventional point-by-point ground survey doesn't fit in these windows and exposes crews to traffic.

Our solution

We survey the corridor with mobile LiDAR at night, at traffic speed or under the contractor's escort, tied to control targets set along the alignment. In a closed tunnel, a semi-mobile "stop and go" unit covers both directions in the same night.

What you gain
  • No added lane closure for the survey
  • Less exposure time for crews
  • A single point cloud that serves several purposes
Deliverables
point cloud of the pavement and surroundingsvector extraction of defects and road featuresDWG plan of the corridor
Related project: Highway 40 East: 16 km night-time mobile LiDAR survey

How do you monitor a structure during post-tensioning, a load test or girder launching?

The problem

During post-tensioning, loading or launching, the engineer needs to know quickly whether the structure is behaving as expected. A measurement delivered three days later is no longer useful for deciding on the next step.

Our solution

We measure camber, elevations and deformations before, during and after each step, with a total station, comparative 3D scanning or both. On the Île-aux-Tourtes Bridge and the Highway 19 bridge, reports were delivered the same day.

What you gain
  • Quick decisions on the next step
  • Deviations documented at each phase
  • Traceability for the owner
Deliverables
post-tensioning and camber control sheetselevation reports by phaseload test deformation report
Related project: Île-aux-Tourtes Bridge: post-tensioning, surveying and 3D scanning

How do you make sure a pour or a new element ends up in the right place?

The problem

On a bridge or overpass, a layout error often shows up once the concrete is poured. Temporary supports, existing ramps and site instructions change during construction, and the layout has to keep up.

Our solution

Our surveyors lay out alignments, bearings, anchors and guardrails on the project's control network, check existing elements before fabrication and stay on site during critical pours. As-built checks close out each stage.

What you gain
  • Deviations caught before the pour
  • Temporary parts fabricated to verified dimensions
  • As-built file ready at acceptance
Deliverables
layout dataas-built plans (paving, concrete, curbs, guardrails)pre-fabrication verification reports
Related project: Bonaventure Expressway: layout and pour validation at axis 37

How do you fabricate new parts that fit an old structure?

The problem

Replacing a girder, steel members or precast slabs on an existing bridge means dealing with geometry that no longer matches the drawings. A part that doesn't fit goes back to the shop, and the planned closure is lost.

Our solution

We scan the target area, then compare the point cloud to the design model or extract what the shop needs: rivet centres in IFC, the profile of a deformed girder, the geometry of a precast mould. On site, we lay out the cut line and position the new part.

What you gain
  • Parts fabricated to actual conditions
  • Less rework in the shop
  • Installation within the planned window
Deliverables
model-to-cloud comparisonrivet centres in IFCdeformation profiles and planspositioning of the new part
Related project: Jacques Cartier Bridge: scanning and surveying since 2012

Our solutions for your sector

What we take care of

Establishing a structure's baseline before any work

We scan the entire bridge, overpass or pylon, including deck undersides and confined spaces, then deliver a georeferenced point cloud and orthoimages of the faces. Drone inspection photos fill in areas that are out of reach. This dated survey supports the rehabilitation plans and becomes the basis of comparison for the next inspection campaign.

  • Actual geometry available before plans and specifications
  • Defects located in a single reference frame
  • Comparison possible from one survey to the next
Scan 3D

Surveying a road corridor during a night window

Our mobile mapping unit surveys the highway, ramps and the undersides of structures at night, under escort or in the flow of traffic. The point cloud is tied to a control network set along the corridor. From it we extract the pavement vectors, defects to repair, clearances and a terrain model for design.

  • No added lane closure for the survey
  • One campaign for several purposes
  • Rehabilitation quantities measured rather than estimated
Mobile mapping

Monitoring a structure while it is loaded

During post-tensioning, a load test or girder launching, we measure elevations, camber and deformations at each step. Depending on the structure, we combine total station, prisms and comparative 3D scanning. Results are presented in a short report, delivered quickly so the engineer can authorize the next step.

  • Each phase monitored on the same reference frame
  • Reports delivered in time to make decisions
  • Deviations documented for the owner
Construction site monitoring

Laying out and checking every element of the structure

Our construction surveyors lay out alignments, abutments, piers, anchors, guardrails and pavement markings from the contractor's files. They check existing elements before temporary parts are fabricated and stay on site during critical pours. As-built plans follow the format required by the owner.

  • Errors caught before the pour
  • A team that keeps up with changing instructions
  • Acceptance file ready at the end of each phase
Construction surveying

Fabricating replacement parts that fit actual conditions

When a girder, steel members or precast slabs must replace existing elements, we scan the area and give the shop what it needs: deformation profiles, comparison to the model, rivet centres extracted from the point cloud. We then lay out the cut line and position the new element on the structure.

  • Less rework in the shop
  • Installation within the planned closure
  • Files the fabricator can use directly (IFC, CAD, Civil 3D)
Scan 3D

Seeing underwater and inside the deck before any work

Piers in rivers and decks that need drilling require information a surface survey can't provide. We survey the riverbed at the foot of the piers with bathymetry, combined with the topographic survey and the scan of the structure. Before drilling or coring, we coordinate rebar detection and guide the drilling in 3D.

  • Structure and riverbed in a single model
  • Drill holes positioned on verified data
  • One point of contact for several types of surveys
Bathymetry

Products and deliverables

Deliverables ready to use

Georeferenced point cloud of the structure

Represent the actual geometry of the structure and its surroundings. For: original drawings incomplete or outdated.

3D model and breaklines in MTQ format

Provide existing conditions in the owner's format. For: conversion and redrafting by the design team.

Vector extraction of pavement and defects

Locate markings, curbs, guardrails, rutting, potholes and cracks. For: rehabilitation quantities estimated by eye.

Post-tensioning sheets and elevation reports by phase

Track the structure's response at each step. For: decision delayed for lack of measurements.

Deformation report (load test, multi-epoch)

Compare unloaded, loaded and post-load states. For: structural behaviour not documented.

Model-to-cloud comparison and rivet centres in IFC

Give the shop the actual geometry of the areas to replace. For: new parts that don't fit.

As-built plans (paving, concrete, curbs, guardrails)

Document the delivered structure. For: acceptance delayed for lack of a file.

Need another format or deliverable?

Tell us which software and standards you use: we prepare the delivery accordingly.

Request a quote →

Our projects · Civil engineering: roads, bridges and structures

Completed projects

A few assignments that show how we work on Quebec’s roads, bridges and structures.

Why choose Topo3D?

One partner, from the first grid line to the as-built

  • From initial survey to as-builtThe same team scans existing conditions, lays out during construction and documents the completed structure, as on the Turcot Interchange or the Île-aux-Tourtes Bridge. You don't have to reconcile data from three different suppliers.
  • Used to short windowsOur road surveys are often done at night, under escort or during full closures, with methods chosen to fit the time allotted.
  • Reports that keep pace with the projectDuring critical phases, elevation and post-tensioning reports are delivered the same day, so the engineer can decide without waiting.
  • Data in your formatModels in MTQ format, Civil 3D, IFC, ReCap or DWG, depending on what your design team or shop already uses.
  • Data checked before it goes outEvery LiDAR or scan deliverable is validated by a technical lead, and the target accuracy is defined with you before the assignment.

Frequently asked questions

Can Topo3D survey a bridge or highway without closing a lane?

Yes, in most cases. Topo3D surveys highways and the undersides of structures in Quebec with mobile LiDAR, at night, in the flow of traffic or under the contractor's escort. The point cloud is tied to control targets set along the corridor. When static scanning is needed, it is planned within a closure the owner or contractor has already scheduled.

How do you monitor bridge deformation during post-tensioning or a load test?

The structure is measured before, during and after each step, on the same control network. Depending on the structure, Topo3D combines total station, prisms and comparative 3D scanning. On bridges in Quebec, such as the Île-aux-Tourtes Bridge, camber and elevation sheets were delivered the same day so the engineer could authorize the next step.

What is a 3D survey used for before rehabilitating a bridge or overpass?

It provides the actual geometry of the structure, including past repairs and deformations that the original drawings don't show. The design team catches conflicts before tendering and calculates its quantities on existing conditions. Topo3D delivers this data in the required format, for example models in MTQ format, Civil 3D drawings or IFC files.

What accuracy can you expect from a bridge or pavement survey?

It depends on the use: a pavement survey to quantify repairs doesn't have the same requirements as a check of steel members to be replaced. At Topo3D, the target accuracy is defined with the client before the assignment, the method is chosen accordingly, and every deliverable is checked by a technical lead before it is sent.

Does Topo3D work for the owner or for the contractor?

Both. In Quebec, Topo3D carries out assignments for owners such as the MTMD, JCCBI or municipalities, for consulting engineering firms during design, and for contractors who build or repair structures. On a single project, it can document existing conditions during design, then provide surveying and checks during construction.

Related sectors

Header photo: Antoine Fleitz (CC BY-SA 4.0, via Wikimedia Commons)

Night closure coming up on your structure?

Quick reply
Quote within 24 to 48 hours

What service(s) are you requesting?
Attach files (optional): drawings, specifications, photosPDF, DWG, DXF, JPG, PNG or ZIP · up to 5 files, 15 MB each. Larger? Share a WeTransfer or Drive link in the message.