Topo3D measures the actual condition of your roads and structures, at night and under traffic, then supports the project all the way to the as-built. You decide on rehabilitation work based on verified data, not on original drawings.
In Quebec, road infrastructure spending goes to maintenance first. The 2026-2036 Quebec Infrastructure Plan sets aside $35.7 billion for the road network, and the asset maintenance deficit on that network has reached $24.5 billion. In the 2026-2027 assessment, barely more than half of the ministry’s structures are rated in good condition. For asset managers and contractors, the challenge is twofold: knowing the actual condition of a structure built decades ago, then working within closure windows of a few hours, often at night. For more than ten years, Topo3D has been scanning, surveying and laying out on bridges, interchanges and tunnels across Greater Montreal and elsewhere in Quebec, for the MTMD, JCCBI, municipalities and their contractors.
Your rehabilitation plans start from a georeferenced point cloud of the structure as it stands today.
Mobile LiDAR and scanning planned around a night closure or an escort, with no additional lane restrictions.
Layout, pour checks and load monitoring, with reports delivered the same day when the team needs them.
Pick the question that sounds like yours






The asset maintenance deficit of Quebec's road network keeps growing, and a significant share of structures are rated in very poor condition. Visual inspections tell you where to look, but they don't always provide measured geometry that can be compared from one year to the next.
Our solutionWe produce a dated baseline of the structure: a georeferenced point cloud, orthoimages of its faces and, where needed, drone inspection photos. A second survey, done later on the same control network, lets you compare the two states and pinpoint what has moved.
What you gain
DeliverablesOn a bridge or interchange built forty or sixty years ago, archived drawings show neither the successive repairs nor the deformations. A conflict between a planned footing and an existing mass, discovered during construction, costs days on site.
Our solutionBefore design or before demolition, we scan the structure and its surroundings, then deliver the data in the design team's format: 3D models in MTQ format, CAD and Civil 3D drawings, profiles. At the Turcot Interchange, this initial campaign covered all the existing structures.
What you gain
DeliverablesMajor road projects follow one another in the Montreal region, and full closures mostly happen at night or on weekends. A conventional point-by-point ground survey doesn't fit in these windows and exposes crews to traffic.
Our solutionWe survey the corridor with mobile LiDAR at night, at traffic speed or under the contractor's escort, tied to control targets set along the alignment. In a closed tunnel, a semi-mobile "stop and go" unit covers both directions in the same night.
What you gain
DeliverablesDuring post-tensioning, loading or launching, the engineer needs to know quickly whether the structure is behaving as expected. A measurement delivered three days later is no longer useful for deciding on the next step.
Our solutionWe measure camber, elevations and deformations before, during and after each step, with a total station, comparative 3D scanning or both. On the Île-aux-Tourtes Bridge and the Highway 19 bridge, reports were delivered the same day.
What you gain
DeliverablesOn a bridge or overpass, a layout error often shows up once the concrete is poured. Temporary supports, existing ramps and site instructions change during construction, and the layout has to keep up.
Our solutionOur surveyors lay out alignments, bearings, anchors and guardrails on the project's control network, check existing elements before fabrication and stay on site during critical pours. As-built checks close out each stage.
What you gain
DeliverablesReplacing a girder, steel members or precast slabs on an existing bridge means dealing with geometry that no longer matches the drawings. A part that doesn't fit goes back to the shop, and the planned closure is lost.
Our solutionWe scan the target area, then compare the point cloud to the design model or extract what the shop needs: rivet centres in IFC, the profile of a deformed girder, the geometry of a precast mould. On site, we lay out the cut line and position the new part.
What you gain
DeliverablesWhat we take care of

We scan the entire bridge, overpass or pylon, including deck undersides and confined spaces, then deliver a georeferenced point cloud and orthoimages of the faces. Drone inspection photos fill in areas that are out of reach. This dated survey supports the rehabilitation plans and becomes the basis of comparison for the next inspection campaign.

Our mobile mapping unit surveys the highway, ramps and the undersides of structures at night, under escort or in the flow of traffic. The point cloud is tied to a control network set along the corridor. From it we extract the pavement vectors, defects to repair, clearances and a terrain model for design.

During post-tensioning, a load test or girder launching, we measure elevations, camber and deformations at each step. Depending on the structure, we combine total station, prisms and comparative 3D scanning. Results are presented in a short report, delivered quickly so the engineer can authorize the next step.

Our construction surveyors lay out alignments, abutments, piers, anchors, guardrails and pavement markings from the contractor's files. They check existing elements before temporary parts are fabricated and stay on site during critical pours. As-built plans follow the format required by the owner.

When a girder, steel members or precast slabs must replace existing elements, we scan the area and give the shop what it needs: deformation profiles, comparison to the model, rivet centres extracted from the point cloud. We then lay out the cut line and position the new element on the structure.

Piers in rivers and decks that need drilling require information a surface survey can't provide. We survey the riverbed at the foot of the piers with bathymetry, combined with the topographic survey and the scan of the structure. Before drilling or coring, we coordinate rebar detection and guide the drilling in 3D.
Deliverables ready to use
Represent the actual geometry of the structure and its surroundings. For: original drawings incomplete or outdated.
Provide existing conditions in the owner's format. For: conversion and redrafting by the design team.
Locate markings, curbs, guardrails, rutting, potholes and cracks. For: rehabilitation quantities estimated by eye.
Track the structure's response at each step. For: decision delayed for lack of measurements.
Compare unloaded, loaded and post-load states. For: structural behaviour not documented.
Give the shop the actual geometry of the areas to replace. For: new parts that don't fit.
Document the delivered structure. For: acceptance delayed for lack of a file.
Tell us which software and standards you use: we prepare the delivery accordingly.
Request a quote →Completed projects
A few assignments that show how we work on Quebec’s roads, bridges and structures.
One partner, from the first grid line to the as-built
Yes, in most cases. Topo3D surveys highways and the undersides of structures in Quebec with mobile LiDAR, at night, in the flow of traffic or under the contractor's escort. The point cloud is tied to control targets set along the corridor. When static scanning is needed, it is planned within a closure the owner or contractor has already scheduled.
The structure is measured before, during and after each step, on the same control network. Depending on the structure, Topo3D combines total station, prisms and comparative 3D scanning. On bridges in Quebec, such as the Île-aux-Tourtes Bridge, camber and elevation sheets were delivered the same day so the engineer could authorize the next step.
It provides the actual geometry of the structure, including past repairs and deformations that the original drawings don't show. The design team catches conflicts before tendering and calculates its quantities on existing conditions. Topo3D delivers this data in the required format, for example models in MTQ format, Civil 3D drawings or IFC files.
It depends on the use: a pavement survey to quantify repairs doesn't have the same requirements as a check of steel members to be replaced. At Topo3D, the target accuracy is defined with the client before the assignment, the method is chosen accordingly, and every deliverable is checked by a technical lead before it is sent.
Both. In Quebec, Topo3D carries out assignments for owners such as the MTMD, JCCBI or municipalities, for consulting engineering firms during design, and for contractors who build or repair structures. On a single project, it can document existing conditions during design, then provide surveying and checks during construction.
Header photo: Antoine Fleitz (CC BY-SA 4.0, via Wikimedia Commons)
Night closure coming up on your structure?
Quick reply
Quote within 24 to 48 hours