





Topo3D surveys existing conditions, lays out and checks the work during construction, then documents the building as built. One team, with data tied to the same reference system, from the first gridline through to operations.
In Quebec, a large share of public investment in buildings goes to renovating hospitals, schools and buildings that are several decades old. The original drawings are often incomplete, buildings stay occupied during the work, and public owners increasingly require a BIM model. On new construction, towers, data centres and institutions impose tight tolerances and compressed schedules. From Boucherville, Topo3D supports contractors, professionals and owners at every stage: existing-conditions surveys, layout and checking of the work, excavation monitoring, building envelope documentation and as-built plans. The goal is simple: every design or site decision should rest on a verified measurement.
Your architects and engineers work from a verified point cloud and model, not from archive drawings that need redrawing.
Layout, plumbness, floor flatness and anchors are checked at the pace of the site, while a correction is still inexpensive.
Plans, model and digital twin remain useful for operations, renovations and future inspections.
Pick the question that sounds like yours








Archive drawings do not show the changes made over the years. A wrong dimension discovered on site leads to change orders, rework and delays. Public owners also require BIM models with a specific level of detail.
Our solutionWe 3D scan the building, inside and out, and tie the point cloud to a georeferenced control network. We then produce the plans, sections, elevations or the Revit model at the level of detail agreed with you before the project starts.
What you gain
DeliverablesA hospital runs day and night. A school or museum is open to the public. Access windows are short, some rooms are sensitive, and every return visit has to be authorized again.
Our solutionWe plan the surveys with the operator, room by room, and choose the method based on the constraints: static scanner for technical areas, handheld scanning when we need to move quickly. The survey aims to capture everything in one pass, to limit return visits.
What you gain
DeliverablesAn offset gridline, an out-of-plumb column or a misplaced anchor carries through to the structure, the envelope and the mechanical systems. The later the error is found, the more it costs to fix.
Our solutionOur surveyors lay out gridlines, columns, formwork and openings from the current drawings, then check plumbness and elevations floor by floor. Deviations are reported to the site team before the next pour or erection.
What you gain
DeliverablesWarehouse racking, server racks, glass partitions and floor finishes require a flat and level slab. F-numbers (FF for flatness, FL for levelness) are set out in ACI 117 and CSA A23.1, and FL does not apply to suspended slabs. A non-conformity discovered after installation turns into a dispute.
Our solutionWe measure the slab by 3D scanning or with a total station and calculate the numbers using the ASTM E1155 method. The report locates the out-of-tolerance areas so that corrections can be targeted.
What you gain
DeliverablesIn a ceiling, a mechanical room or on a roof, the structure, ducts and existing equipment leave little room. A base offset from the drawings or an unexpected duct blocks installation and delays orders.
Our solutionWe scan the area concerned and deliver dimensioned drawings or a 3D model that engineering can open in its software. Comparing the design model with the point cloud brings out clashes before fabrication.
What you gain
DeliverablesIn urban settings, excavations run alongside buildings, streets and utilities. Beyond 6 m deep, the site is considered high risk and the shoring drawings must be sealed by an engineer. Without regular measurements, movement of the shoring or of a neighbouring building goes unnoticed until cracks appear.
Our solutionWe lay out the soldier pile walls, the piles and the mass excavation, then monitor movement with prisms and a total station or by repeated scanning. The engineer in charge receives data that can be compared from one reading to the next.
What you gain
DeliverablesThe Building chapter of the Quebec Safety Code (often called “Bill 122”) requires owners of buildings with five or more storeys to obtain a facade report every five years, signed by an engineer or an architect. Inspecting an entire facade up close requires scaffolding or an aerial lift, at great cost.
Our solutionWe provide the signing professional with a complete working base: point cloud and georeferenced elevations of the facade, and high-resolution drone photos depending on the site. The professional then targets the close-up inspections. The report and the certification remain the responsibility of the engineer or architect.
What you gain
DeliverablesOnce the walls are closed and the slabs poured, ducts and anchors are no longer visible. Photo reports cannot be measured. Owners often receive drawings that do not reflect what was actually built.
Our solutionWe scan the site at key stages, before walls and ceilings are closed, and publish the surveys on a collaborative 3D platform such as Prevu3D. At the end of the project, we produce the as-built plans.
What you gain
DeliverablesWhat we take care of

Before a renovation, an addition or a fit-out, we survey existing conditions in 3D and tie them to the project's coordinate system. Your professionals receive a complete point cloud, followed by the plans or BIM model at the level of detail that matches the intended use. Design choices start from the building's current condition, room by room.
Our surveyors join your site at the pace of the pours and erection. They lay out gridlines, columns, formwork, anchors and openings, check the plumbness of shafts and columns, and report deviations before the next stage. Data is tied to the same control network from the start to the end of the project.

Warehouses, data centres, hospitals, office towers: the slab determines how racking, server racks and partitions are installed. We measure flatness and levelness using the method set out in the specifications, or slab-to-slab elevations along future partitions, and deliver a report that locates every area to be corrected. Accuracy is suited to the intended use and confirmed before the project starts.

From the layout of soldier pile walls and piles down to the mat foundation, we support the excavation and monitor movement of the shoring and neighbouring buildings. Readings are taken with prisms and a total station or by repeated scanning, at the frequency requested by the engineer. Each report can be compared with the previous one, which makes the decision to intervene easier.

Panel replacement, anchors for a new facade, five-year inspection: we accurately survey the envelope and slab edges, then deliver elevations and drawings that engineers and fabricators use directly. For the inspection required by the Safety Code, we provide the data; the engineer or architect signs the report.

We scan the site at the stages you choose, especially before walls and ceilings are closed, and make the surveys viewable online with Prevu3D. Site teams, professionals and the owner all see the same measured condition. At the end, the as-built and the digital twin serve operations and future renovations.
Deliverables ready to use
Record the complete geometry of the building. For: incomplete or inaccurate archive drawings.
Design and coordinate in BIM. For: model required by the owner.
Draw and dimension existing conditions. For: slow and partial manual surveys.
Place the work according to the drawings. For: layout errors that carry through.
Check the plumbness of shafts and columns. For: plumbness deviations discovered too late.
Measure flatness and levelness. For: non-compliant slab after installation.
Compare design with existing conditions. For: equipment or duct that does not fit.
Measure the shoring and neighbouring buildings. For: movement detected too late.
Track progress and document what gets hidden. For: final drawings that do not reflect the work.
Completed projects
Hospitals, downtown towers and data centres: here are three projects where our surveys guided construction.
One partner, from the first grid line to the as-built
It is the measurement of the building as it stands today, before a renovation or an addition. Topo3D 3D scans the interior and exterior, ties the data to a control network, then produces plans, sections or a Revit model. Architects and engineers can then design from actual conditions rather than archive drawings, which reduces surprises on site.
The FF (flatness) and FL (levelness) numbers are calculated using the ASTM E1155 method, which ACI 117 and CSA A23.1 refer to. In Quebec, Topo3D measures the slab by 3D scanning or with a total station and delivers a report that locates the out-of-tolerance areas. FL does not apply to suspended slabs. The requirements come from the project specifications.
The obligation comes from the Building chapter of the Quebec Safety Code, often called “Bill 122”. It requires a report every five years for buildings with five or more storeys, signed by an engineer or an architect. Topo3D provides the facade survey data, such as the point cloud and elevations. The professional uses it to target the inspections and signs the report.
Yes. Topo3D plans the surveys with the operator, zone by zone, to respect patient care, classes and access rules. The method is chosen based on the constraints: static scanner for technical rooms, handheld scanning for large numbers of rooms. The goal is to capture everything in one pass, to limit return visits to sensitive areas.
The level depends on the intended use: an interior fit-out does not require the same model as a complete mechanical renovation. For Quebec public projects, the owner's BIM requirements document often sets the expectations. Topo3D agrees on the LOD with you before the project and models from the point cloud. Our article on LOD in scan-to-BIM details the possible choices.
Header photo: Jean Gagnon (Jeangagnon), CC BY-SA 4.0, via Wikimedia Commons
Your next project starts with an accurate measurement
Quick reply
Quote within 24 to 48 hours