Mines et carrières

Mine Surveying, Quarry Volumetrics and Extraction Site Surveys

Topo3D measures your stockpiles, pits, walls and dikes so that your inventories, declarations and operating decisions rest on measured volumes and surfaces that can be compared from one campaign to the next.

In Quebec, mineral resource operations are measured in volumes. A quarry declares to the municipality the quantities removed from the site. A mine reconciles the ore extracted against its forecasts every month, and its restoration plan, revised every five years, relies on a financial guarantee that covers all estimated costs. Graphite, lithium and rare earth projects need reliable topography from the feasibility study onward. In every case, a poorly estimated volume is costly: disputed royalties, phantom stockpiles or underestimated restoration work. Topo3D surveys extraction sites by drone, from the ground and on the water, then calculates volumes and differences between two campaigns using a consistent method.

Volumes you can defend

Every calculation rests on a measured surface and a documented method, useful in front of a controller, an auditor or a municipality.

Fewer people on stockpiles and near walls

Drones and scanners measure remotely the areas where walking is a risk.

Reliable year-over-year comparison

The same reference network and the same method make the differences between campaigns meaningful.

What is your challenge?

Pick the question that sounds like yours

Does my month-end inventory match what is actually on the ground?

The problem

Stockpiles of ore, waste rock or aggregates are often estimated from hauled tonnage or partial measurements. Discrepancies build up until reconciliation, and the adjustment comes late in the financial statements.

Our solution

We survey the stockpiles by drone photogrammetry or drone LiDAR, then calculate the volume of each stockpile from a base surface defined with you. The report gives a volume per stockpile, with the date and the method, to make reconciliation easier.

What you gain
  • Inventories based on measurement
  • Discrepancies caught earlier in the fiscal year
  • The entire site surveyed in a single visit
Deliverables
volume report by stockpilesite orthophotodigital surface modelplan of identified stockpiles

Will the volumes I declare to the municipality hold up if they are challenged?

The problem

Duties imposed on quarry and sandpit operators are calculated on the quantities removed from the site, often declared under oath. A 2026 Court of Québec decision shows what happens when the declaration is no longer considered reliable: the quantity is then established by other means.

Our solution

We measure the quarry at regular intervals and calculate the volume extracted between two surveys from comparable surfaces. The raw data, the reference network and the calculation method are kept so that a third party can redo the calculation.

What you gain
  • A documented extracted volume for each period
  • Data kept and verifiable
  • Support for your discussions with the municipality
Deliverables
dated site surfacesextracted volume calculation between two epochsmap of extraction and fill areasmethod report

How much reserve is left in my quarry?

The problem

The Québec Infrastructure Plan 2025-2035 is sustaining demand for aggregates for major projects. To commit to multi-year contracts or plan a site expansion, the operator needs to know the volume remaining within the authorized limits, not just the volume already extracted.

Our solution

Using the current site survey and the operating limits you provide (floor elevation, final slopes, property lines), we calculate the remaining volume to be extracted and produce the sections that illustrate it.

What you gain
  • A quantified reserve for sales planning
  • Clear sections for internal discussions
  • A base to update with each annual survey
Deliverables
current digital terrain modelremaining volume calculationtypical sectionspit plan

How do I monitor an unstable wall or slope without exposing my crews?

The problem

Excavation work in a mine requires engineered plans and specifications, and a moving slope must be monitored. Sending a surveyor to the toe or crest of an unstable wall creates exactly the risk you are trying to control.

Our solution

We measure the wall remotely, by terrestrial 3D scanning from a safe position or by drone, and track prisms with a total station in critical areas. Each campaign is compared with the previous one to show displacements and areas of material loss.

What you gain
  • Measurements taken outside the hazard zone
  • Displacements mapped across the entire wall
  • Data handed to the geotechnical engineer in a usable format
Deliverables
deviation maps between epochsprism displacement tableswall sectionsgeoreferenced point cloud

Are my tailings dikes and ponds documented for the engineer of record?

The problem

Tailings storage facilities are closely watched by authorities, investors and communities. The international GISTM standard expects a combination of inspections, instruments and remote sensing. The geometry of the dikes and the actual volume of the ponds must be known for the engineer to reach a conclusion.

Our solution

We survey the crest, slopes and surroundings of the dikes by drone or by scanning, then measure the bottom of accessible ponds by bathymetry. Both surveys are combined in the same reference system to produce sections and volumes.

What you gain
  • Up-to-date dike geometry
  • A pond volume calculated on a measured bottom
  • Sections ready for stability analysis
Deliverables
3D model of the dikes and pondcross-sectionsbottom surfacecontrol point report
Related project: Carillon dike: survey for Hydro-Québec

Is my restoration plan based on up-to-date waste rock pile volumes?

The problem

The rehabilitation and restoration plan is revised every five years, and the financial guarantee covers all planned costs. The quantities of waste rock and materials to be moved weigh heavily in that calculation. Outdated volumes can skew the estimate of the guarantee.

Our solution

We survey the waste rock piles, storage areas and surfaces to be rehabilitated, then calculate the volumes and areas requested by the firm preparing the plan. A dated survey serves as the baseline for the next revision.

What you gain
  • Measured restoration quantities
  • A better-supported five-year revision
  • Areas and volumes that are consistent with each other
Deliverables
volumes by waste rock pileareas by surface typeorthophotodigital terrain model

Do I have reliable topography to design my mining project in a remote region?

The problem

Graphite, lithium and rare earth projects are concentrated in Nord-du-Québec, Abitibi-Témiscamingue and the Côte-Nord. The feasibility study must size the pit, roads, storage areas and ponds on land that is often forested and far from reference networks.

Our solution

We first establish a GNSS control network, then survey the site by drone LiDAR, which measures the ground beneath the vegetation. For very large areas, we coordinate an airborne LiDAR survey. The data is delivered in the project coordinate system.

What you gain
  • A terrain model beneath the vegetation
  • A reference network reusable during construction
  • Logistics planned for remote sites
Deliverables
control network and benchmark sheetsdigital terrain modelcontour linesorthophoto
Related project: Abitibi Roads: drone LiDAR and DTM for the MTMD

How do I modify my concentrator or processing plant without reliable drawings?

The problem

Grinding, crushing and processing facilities evolve with process changes. The drawings no longer show the added piping, conveyors or structures, and a poorly prepared production shutdown is expensive.

Our solution

We scan the affected areas with a laser scanner, then model the structure, equipment, piping and cable trays at the agreed level of detail. The engineering team designs the modifications directly in that model.

What you gain
  • A design based on measured existing conditions
  • Interferences detected before the shutdown
  • A model reusable for future projects
Deliverables
point cloudLOD 300 3D model in DWG or STEP2D plansinterference report
Related project: CGC plant in Montreal: scanning and LOD 300 model of the ball mill area

Our solutions for your sector

What we take care of

Stockpile inventories that are measured, not estimated

A single drone flight covers every stockpile on a site without anyone climbing on them. We define the base surface of each stockpile with you, then deliver a volume per stockpile with the survey date. Covered stockpiles or those against a wall are completed with a terrestrial scanner. The report format aligns with your month-end reconciliation.

  • No personnel on the stockpiles during measurement
  • A dated, identified volume for each stockpile
  • The same method for every inventory
Photogrammetry

Annual monitoring of your quarry or sandpit

We survey the site on a fixed date and compare each survey with the previous one. You get the volume extracted during the period, the volume remaining within the authorized limits and updated sections. The raw data and the method are kept, so the calculation can be redone if needed, for example during a review by the municipality.

  • Extracted volume and remaining reserve in the same report
  • Data kept from one year to the next
  • Documented support for your declarations
Aerial Surveys

Slopes and walls monitored remotely

For a pit wall or a working face that needs watching, we measure from a safe position. The terrestrial scanner captures the entire wall surface; the total station tracks prisms at critical locations. Each campaign produces a deviation map compared with the previous one, which the geotechnical engineer can bring into the stability monitoring.

  • Measurements taken outside the rockfall zone
  • Displacements visible across the entire wall
  • Campaign frequency suited to the risk
Construction Monitoring

Dikes, ponds and waste rock piles documented for the engineer

We combine the survey of dikes and waste rock piles, done by drone or scanning, with the bathymetry of accessible ponds in the same reference system. The engineer receives sections, volumes and a continuous surface, from the bottom of the pond up to the crest. The same data is used for the restoration plan revision.

  • Up-to-date dike geometry
  • Measured pond and waste rock pile volumes
  • A single campaign for monitoring and restoration
Bathymetry

A topographic base to design your mining project

From advanced exploration to construction, we provide the control network and terrain model on which the pit, roads and infrastructure are designed. Drone LiDAR measures the ground beneath the boreal forest; for larger areas, we coordinate an airborne survey. Logistics are planned for sites reachable only by forest road or by air.

  • Terrain measured beneath the vegetation
  • A reference network carried over into construction surveying
  • A single team from study to construction
Control Network

Processing facilities surveyed before they are modified

Concentrator, mill, conveyors or crushing building: we scan the areas affected by your work and produce a 3D model of the structure, equipment and piping. Your engineers design the modifications in it and check interferences before the shutdown. The model is delivered in the formats of your design software.

  • A model of existing conditions ready for design
  • Clashes identified before the production shutdown
  • Deliverables in DWG, STEP or Revit
3D Scanning

Products and deliverables

Deliverables ready to use

Volume report by stockpile

Quantify stockpiles on a given date. For: inventory estimated from hauled tonnage.

Extracted volume calculation between two epochs

Measure production for a period. For: declaration open to challenge.

Remaining volume calculation and sections

Quantify the reserve within authorized limits. For: sales planning without a known reserve.

Deviation map between epochs

Show displacements of a wall or dike. For: monitoring that exposes personnel.

3D model of dike and pond, bottom surface

Combine geometry above and below the water. For: unknown pond volume.

Volumes by waste rock pile and areas

Feed the restoration plan. For: guarantee calculated on outdated quantities.

Control network and digital terrain model

Serve as the base for site design. For: topography missing or hidden by forest.

LOD 300 3D model (DWG, STEP)

Design plant modifications. For: incomplete plant drawings.

Need another format or deliverable?

Tell us which software and standards you use: we prepare the delivery accordingly.

Request a quote →

Our projects · Mines and quarries

Completed projects

Our mining and quarry project pages are in preparation; here is a published project that illustrates our work in a grinding facility.

Why choose Topo3D?

One partner, from the first grid line to the as-built

  • A consistent volumetric methodThe same reference network, the same base surface and the same calculation from one campaign to the next, so that measured differences reflect site activity and not a change in method.
  • Drone, scanner, bathymetry and surveying under one coordinationStockpiles, walls, dikes and ponds can be surveyed during the same mobilization and delivered in a single coordinate system.
  • Drone pilots certified by Transport CanadaFlights are planned around your site rules, your blasting zones and your production schedules.
  • Used to remote sitesOur crews have already worked in isolated regions, including James Bay, with a control network established on site to register and georeference the data.

Frequently asked questions

How does Topo3D calculate the volume of an aggregate or ore stockpile?

Topo3D surveys the stockpile by drone photogrammetry or drone LiDAR, which produces a 3D surface of its top. The volume is calculated between that surface and a base surface defined with the operator, for example the original ground or a slab. The report gives a volume per stockpile, the date and the method. Covered stockpiles are completed with a terrestrial scanner.

How often should a quarry or sandpit be measured?

The frequency depends on how the data will be used. An accounting inventory is often measured at the end of each month or fiscal year; a declaration to the municipality follows the period set by its by-law; reserve monitoring can be annual. In Quebec, Topo3D recommends keeping the same date, the same method and the same reference network so surveys can be compared.

Is a drone accurate enough to measure stockpile volumes?

A drone is suitable for most stockpile inventories, provided it relies on ground control points and the base surface is properly defined. Accuracy depends on the sensor, the altitude, the shape of the stockpiles and the vegetation. Topo3D defines with you the accuracy suited to the use and confirms it in the quote, before the survey.

Can a pit wall be monitored without sending personnel nearby?

Yes. A terrestrial laser scanner set up at a distance captures the entire wall surface, and a total station can track prisms installed in critical areas. By comparing two campaigns, Topo3D produces a map of displacements and material loss. Interpreting stability remains the responsibility of the site's geotechnical engineer.

Can Topo3D survey a remote mine site in northern Quebec?

Yes. Topo3D has already carried out surveys in isolated regions, including James Bay. On a site with no nearby reference network, the crew first establishes GNSS control points, then surveys the terrain by drone LiDAR, which measures the ground beneath the vegetation. For very large areas, Topo3D coordinates an airborne LiDAR survey.

Related sectors

Your next inventory can be measured instead of estimated

Quick reply
Quote within 24 to 48 hours

What service(s) are you requesting?
Attach files (optional): drawings, specifications, photosPDF, DWG, DXF, JPG, PNG or ZIP · up to 5 files, 15 MB each. Larger? Share a WeTransfer or Drive link in the message.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.